A bathroom renovation is an exciting project that can completely transform the look and functionality of your space. However, one of the biggest questions homeowners have is, “How long does a bathroom renovation take?” The timeline can vary depending on factors like the complexity of the design, material availability, and any unforeseen structural issues. Understanding the renovation process can help you plan ahead and minimise disruptions to your day-to-day life.
When undertaking bathroom renovations in north Brisbane, we have to account for factors like atmospheric humidity which can affect drying times for waterproofing, paint, screed, tile adhesive and silicone. We follow a structured renovation timeline to ensure efficiency without cutting corners. While every project is unique, for a highly efficient and organised construction company like ours most full bathroom renovations take around two weeks once construction begins. Below, we’ll break down the key phases of a bathroom renovation so you know what to expect:
Phase 1: Design and Planning (1-4 Weeks, Varies By Client)

Before the renovation starts, the planning phase lays down the foundation for a smooth process. This is the stage where we sit down with you to discuss your vision, finalise layouts, and select all the materials from tiles and tapware to vanities and lighting.
During this phase, we also take care of necessary approvals and permits (if required) so you don’t have to worry about unexpected red tape. To keep things moving, we order the materials in advance so everything is ready before the construction begins. Once the plan is locked in and materials are secured, we’ll schedule the renovation start date and get everything prepared for a smooth transformation.
Phase 2: Demolition and Strip-Out (1-2 Days)
Now the real work begins! We remove old tiles, cabinetry, fixtures, and flooring to make way for your brand-new space. Our team works efficiently, making sure that everything is stripped out safely and all debris is disposed of properly, keeping your home as tidy as possible during the process.
This step also allows us to inspect for any hidden surprises such as water damage or outdated plumbing. Given Brisbane’s humid climate, moisture-related issues are very common and catching them early on prevents bigger problems down the road. If anything needs extra attention, we will need to address it before moving forward.
Phase 3: Plumbing and Electrical Rough-in (1-2 Days)

With the old bathroom gone, it’s time to get the essentials in place. Our licensed plumbers and electricians will then install new pipes, drains, and wiring to support your updated layout. If you’re adding extra lighting or relocating major elements like your shower or vanity, this is when those changes happen.
Ensuring compliance with local plumbing and electrical regulations ensures long-term reliability and safety. Once plumbing and electrical work are in place, we’re ready to start sealing everything up and bring your bathroom to life.
Phase 4: Surface Preparation (1-2 Days)
Before we apply waterproofing, it’s essential to prepare the surfaces properly to ensure a durable and seamless finish. During the strip-out phase, walls can often sustain damage when tiles are removed. This is the time to replace damaged sections of drywall and ensure all surfaces are smooth and structurally sound before moving forward. For floors, a screed mix is used to achieve the correct slope towards the floor waste, ensuring proper drainage.
If structural reinforcements are needed, such as strengthening floors for heavy fixtures or preparing walls for large-format tiles, we complete them at this stage. Once everything is set and cured, we move on to waterproofing, ensuring your bathroom is protected against moisture damage for years to come.
Phase 5: Waterproofing (1-2 Days)

Waterproofing is a critical step that protects your bathroom from long-term damage. We apply a high-quality waterproofing membrane to all wet areas to prevent leaks and moisture build-up. Since the bathroom is constantly exposed to water and high humidity levels, getting this part right is essential for avoiding issues like mould and water damage in the future. With updates to Australian waterproofing standards, it’s more important than ever to make sure your bathroom meets the latest industry requirements for durability and protection.
Phase 6: Tiling and Floor Installation (3-4 Days)
Now comes one of the most exciting parts of bathroom renovations—tiling and floor installation! Tiling is where your bathroom really takes shape. Whether you’re going for a bold statement or a subtle, elegant finish, we take time to lay each tile with precision. Many Brisbane homeowners often opt for light, neutral tones to create an airy, open feel but make sure your tiling choice reflects your personal style. Not sure what to pick? Here’s a guide on what tiles to use for your bathroom
Since proper installation is key to long-lasting results, we allow for drying and setting time before moving on. Once the walls and floors are finished, everything starts to come together and your new bathroom will begin to look like the space you imagined.
Phase 7: Fixtures and Cabinetry Installation (2 Days)

With the groundwork complete, it’s time to add all the elements that make your bathroom functional and stylish. We’ll install vanities, sinks, tapware, shower screens, and toilets, making sure that everything is positioned correctly. Smart storage solutions are also a popular choice since many homeowners want to maximise space.
We’ll also install mirrors, tower rails, shelving, and other finishing touches that bring your vision to life. Every detail is carefully placed to create a practical and beautiful bathroom.
Phase 8: Painting and Final Touches (1 Day)
A fresh coat of moisture-resistant paint gives your bathroom a crisp, polished look. Many homeowners choose soft, neutral tones to create a bright and inviting atmosphere. At this stage, we’ll also apply silicone sealing around joints and edges, protecting against water damage. Once painting is done, we’ll do a deep clean like removing dust, debris, and any leftover construction materials so your new bathroom is fresh and move-in ready.
Phase 9: Handover and Final Inspection (1 Day)
Before we hand over your new bathroom, we conduct a final quality check. We inspect everything to make sure it’s flawless and up to standard. Once we’re happy with every detail, we walk you through your newly renovated space and provide tips on how to maintain it. If you have any last-minute questions, we’re here to help. After that, all that’s left to do is to enjoy your stunning new bathroom!
Conclusion
A bathroom renovation doesn’t have to be stressful or take forever. Our streamlined process allows us to complete most renovations in under 2 weeks, keeping disruptions to a minimum. Since we understand the unique challenges of Brisbane homes from humid conditions to space limitations, we customise each renovation to suit your lifestyle and needs. While unexpected surprises can sometimes arise, we’re always ready to tackle these challenges and keep you informed about any changes.
So there you have it. Now you know how long a bathroom renovation take in Brisbane. If you’re looking to giving your bathroom a fresh upgrade, don’t hesitate to give us a call on (07) 3184 4592! We’ll schedule an onsite consultation and provide a free quote to transform your bathroom and help you create a stylish, functional bathroom that’s ready on time and within budget.